Seagull Mini MXS-R EP Specifications Page 16

  • Download
  • Add to my manuals
  • Print
  • Page
    / 21
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 15
MINI MXS-R EP Instruction Manual.
16
5) Slide the vertical stabilizer back in
place. Using a triangle, check to ensure that
the vertical stabilizer is aligned 90º to the hori-
zontal stabilizer.
90º
Vertical
Stabilizer.
Horizontal
Stabilizer.
6) When you are sure that everything is
aligned correctly, mix up a generous amount of
Flash 30 Minute Epoxy. Apply a thin layer to the
mounting slot in the top of the fuselage and to
the sides and bottom of the vertical stabilizer
mounting area. Apply epoxy to the bottom and
top edges of the filler block and to the lower
hinge also. Set the stabilizer in place and re-
align. Double check all of your measurements
once more before the epoxy cures. Hold the
stabilizer in place with T-pins or masking tape
and remove any excess epoxy using a paper
towel and rubbing alcohol. Allow the epoxy to
fully cure before proceeding.
ELEVATOR - RUDDER PUSHROD HORN
INSTALLATION.
1) Install the elevator control horn using
the same method as with the aileron control
horns.
2) Position the elevator control horn on
the both side of elevator.
C/A glue.
Hinge.
When cutting through the covering to re-
move it, cut with only enough pressure to
only cut through the covering itself. Cutting
into the balsa structure may weaken it.
Pen.
Cut.
4) Remove the stabilizer. Using a mod-
eling knife, remove the covering from below
the lines you drew.
Page view 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21

Comments to this Manuals

No comments